Land
Producing leases and pad infrastructure.
Land · Power · Fiber · Then AI
Wellhead gas and fiber first. Then Bitcoin mining and technology energy campuses — midstream and connectivity status stated plainly.
The stack
How Texoil Ventures sequences the field.
Producing leases and pad infrastructure.
Behind-the-meter gas sized to lease supply — Existing, Engineered, or Conceptual as labeled.
AT&T-validated 400 Gbps at Atlas 1, Atlas 2, and Atlas 3.
Bitcoin mining and technology energy campuses on well gas.
Field midstream
Some elements exist in the field; commercial frameworks may remain planning-level.
Meter presence at the 4H location supports takeaway optionality for lease gas.
Commercial framework on file for an approximately 16-mile Enterprise compressor lateral. Terms are planning-level — not represented as fully executed takeaway.
Connectivity
In Process
AT&T has validated 400 Gbps dedicated fiber at Atlas 1, Atlas 2, and Atlas 3 — operational communications and campus connectivity across the Ventures footprint.
POWERING THE FUTURE.
FROM THE FIELD UP.