Land · Power · Fiber · Then AI

The future of oil and gas

Wellhead gas and fiber first. Then Bitcoin mining and technology energy campuses — midstream and connectivity status stated plainly.

The stack

Land. Power. Fiber. Then AI.

How Texoil Ventures sequences the field.

1

Land

Producing leases and pad infrastructure.

2

Power

Behind-the-meter gas sized to lease supply — Existing, Engineered, or Conceptual as labeled.

3

Fiber

AT&T-validated 400 Gbps at Atlas 1, Atlas 2, and Atlas 3.

4

Then AI

Bitcoin mining and technology energy campuses on well gas.

Field midstream

Dual-gas pathways

Some elements exist in the field; commercial frameworks may remain planning-level.

Existing

Energy Transfer meter — flagship lease

Meter presence at the 4H location supports takeaway optionality for lease gas.

Planning-level

Enterprise ~16-mile compressor lateral

Commercial framework on file for an approximately 16-mile Enterprise compressor lateral. Terms are planning-level — not represented as fully executed takeaway.

Connectivity

Fiber into the field

In Process

AT&T has validated 400 Gbps dedicated fiber at Atlas 1, Atlas 2, and Atlas 3 — operational communications and campus connectivity across the Ventures footprint.

Labeling discipline. Conceptual power or campus capacity is never presented as existing. If a figure is not cleared, it does not appear on texoilusa.com.

Status legend

  • ExistingIn service / of record
  • ContractedAgreement executed
  • In ProcessUnderway / being delivered
  • EngineeredDesigned, not installed
  • ConceptualPlanning only

POWERING THE FUTURE.

FROM THE FIELD UP.